Harvy Cardeno

Photo

Electrical Engineer

Cebu, Philippines

Curriculum Vitae

 

HARVY JADRAQUE CARDEÑO   

180 Nivel Hills, Busay, Cebu City

Cebu, Philippines

Mobile Number:+63 925 5998 804

E-mail Address: harvy_c1005@yahoo.com

hjcardeno@gmail.com

 

 

Objectives:  

– To be able to work in a company that will expand and harness my skills, apply knowledge and attitude towards the clientele of the company as a competent Licensed Electrical Engineer.

 

_________________________________________________________________________________________
PERSONAL DATA

 

Date of Birth:                            October 05, 1990

Age:                                         25yrs old

Sex:                                         Male

Birthplace:                               Malabuyoc, Cebu, Philippines
Civil Status:                             Single
Nationality:                               Filipino

Languages/Dialects Spoken:    Cebuano, Filipino, English

Skills/Knowledge:                    EIM-NCII (Electrical Installation & Maintenance),Wiring & Troubleshooting, Power System Analysis, AutoCAD Drafting, Sketch Up Drafting, Web Surfing on Innovations, Computer Skills (Microsoft, Excel etc.), Basic Knowledge on PLC Siemens S7200, Basic Knowledge of Power System Designing using ETAP Software

 

 

In Case of Emergency, please contact: Felicula B. Jadraque

180 Nivel Hills, Busay, Cebu City, Cebu, Philippines

Contact Number: 0922 200 4751

 

___________________________________________________________________________________

EDUCATIONAL ATTAINMENT AND BACKGROUND

 

 

 

2012 –  Present             Licensed, Registered Electrical Engineer

 

2007 – 2012                  Bachelor of Science in Electrical Engineering

University of San Jose- Recoletos

Magallanes St., Cebu City, Philippines

 

 

2003 – 2007                  Secondary

Cerdeña National High School

Cerdeña,Malabuyoc, Cebu, Philippines

 

 

1997 – 2003                  Primary

Cerdeña Elementary School

Cerdeña, Malabuyoc, Cebu, Philippines

 

 

_________________________________________________________________________________________

WORK EXPERIENCES

 

 

 

PRIMARY STRUCTURES CORPORATION

AAA LICENSED GENERAL CONTRACTOR

(Architectural, Structural, Civil and MEPF)

PSC Bldg. #333 V. Rama Ave., Guadalupe,

 Cebu City 6000 Philippines

 

 

Primary Structures Corporation

Designation:  Project Management Team (Project Electrical Engineer – 2)

Project:          Maayo Medical Center

Location:       Plaridel St. Alang-Alang, Mandaue City, Cebu, 6014, Philippines

Description:  A 16 Storey building divided with six floors Medical Facility & ten floors Hotel Accommodation.

Duration:  July2016 – present

 

 

   SCOPE OF WORK    

1.     Supervise in implementation of plans and technical specifications of Electrical and Auxiliary system.

2.     Conducts load scheduling of the project.

3.     Conducts an in- house -estimates in comparison to the Sub-contractor’s proposals.

4.     Review and evaluate shop drawings for Owner/Client, Designer and Architects approval.

5.     Check and review materials delivery based on approved SPECS.

6.     Check the quality and workmanship of the Sub-contractors installation as per SPECS and Standards.

7.     Conducts inspection.

8.     Implement proper housekeeping.

9.     Monitor and secure all supplied materials and equipments storage and warehousing.

10.  Monitors accomplishments and productivity rates.

11.  Conducts orientation on techniques to increase productivity.

 

 

 

 

Primary Structures Corporation

Designation:  Project in Charge (Project Electrical Engineer – 2)

Project:          Atomed Cebu NF2 Building Expansion

Location:       MEPZ 2, Basak, Lapu-Lapu City, Cebu, 6015, Philippines

Description:State-of-the-artfacility that manufactures quality medical disposables and incubators

coupled with rigid manufacturing and quality control protocols which are accepted at hospitals and clinics worldwide.

Duration:  December 2015 – June 2016

   SCOPE OF WORK    

1.     Supervision in implementation of plans and technical specifications of all Construction trades (Structural, Civil Works, Architectural, Electrical, Auxiliary, Mechanical, Plumbing, Fire Sprinkler, Compressed Air and Process Cooling).

2.     Evaluate and monitor accomplishment of the project with respect to the scheduled date of completion.

3.     Monitors Budget and expenses of the project.

4.     Conducts load scheduling of the project.

5.     Conducts an in- house -estimates in comparison to the Sub-contractor’s proposals.

6.     Assess and evaluate Sub-contractors work proposal for all Construction trades prior to contract awarding.

7.     Review and evaluate shop drawings for Owner/Client, Designer and Architects approval.

8.     Check and review materials delivery based on approved SPECS.

9.     Check the quality and workmanship of the Sub-contractors installation as per SPECS and Standards.

10.  Supervise and monitor installation and inspection prior to concrete pouring.

11.  Evaluates billing percentage submitted by subcontractors for processing.

12.  Attends weeklycoordination meeting with the Owner/Client.

13.  Prepares Project progress billing to be submitted and for approval of the Owner/Client.

14.  Review Project Manpower and equipment load scheduling.

15.  Sets-up the Temporary power of the Construction Site.

16.  Implement proper housekeeping.

17.  Monitor and secure all supplied materials and equipments storage and warehousing.

18.  Supervise on Rectification of Punchlist items and correction of defects in preparation for Turnover.

19.  Conducts Orientation on MEPF Trade as part of Turnover ( Electrical System, Mechanical System, Process Cooling System, Compressed Air System, Vacuum Air System) to secure continuity and operational of the system.

20.  Suggest ideas and knowledge for an ideal and effective PMS(Preventive Maintenance Services) in every system.

21.  Conducts Project Turnover and Close-out.

 

Primary Structures Corporation

Designation:  Project Electrical Engineer – 2

Project:          University of Cebu Medical Center (UCMed)

Location:       North Reclamation Area, Subangdako, Mandaue City, Cebu, Philippines

Description:  A State-of-the-art Hospital which is the first in Southeast Asia to introduce a

“fully- integrated” 3D Endoalpha Minimally Invasive Surgery (MIS) operating room and a 3D mammography with tomosynthesis and first to have a flow cytometer in the Visayas and Mindanao, Philippines.

Duration: June 2013 – December 2015

  SCOPE OF WORK   

1.     Supervision in implementation of plans and technical specifications of Electrical  System(Medium Voltage and Low Voltage Switchgears, Automatic Transfer Switch, Synchronization Panels, Busducts and Distribution Panels) and Auxiliary System (FDAS, CCTV, CATV, Voice and Data, PA/BGM, Nurse Call).

2.     Conducts an in- house -estimates in comparison to the Sub-contractor’s proposals.

3.     Assess and evaluate Sub-contractors work proposal for Electrical and Auxiliary works.

Evaluates and review Contracts and Scope of work for Electrical and Auxiliary sub-contractors.
Review and evaluate shop drawings for Owner, Designer and Architects approval.
Quantify and request the necessary materials to be purchased based on approved SPECS.
7.     Canvass possible supplier considering the time and cost without sacrificing the quality based on Specs and Standards.

Check and review materials delivery based on approved SPECS.
Check the quality and workmanship of the Sub-contractors installation as per SPECS and Standards.
10.  Supervise and Monitor Electrical and Auxilliary Layout, installation and inspection prior to concrete pouring.

Evaluate Electrical and Auxiliary accomplishment reports with respect to the scheduled date of completion.
Evaluates billing percentage submitted by subcontractors for processing.
Attend weeklyMEPF coordination meeting.
Conducts testing and commissioning prior to energization and start-up of all trades for Electrical and Auxiliary including test results.
Assist and facilitate necessary requirements during Energization and Equipment Start-up.
Initiates and conducts Orientation to the Maintenance/Owner’s representatives.
17.  Quantity Estimates for Additives and Deductives as per actual installation being the pre-requisites for Reconciliation.

Review and update Electrical and Auxiliary As-Built-Drawings.
Review Electrical and AuxiliaryManpower and equipment load scheduling.
Sets-up the Temporary power of the Construction Site.
Enforce safety to all Electrical Activities including hazards in temporary power supply of the construction site.
Implement proper housekeeping.
23.  Monitor and secure all supplied materials and equipments storage and warehousing.

24.  Supervise on Rectification of Punchlist items and correction of defects in preparation for Turnover.

Conducts Project Turnover and Close-out.
Primary Structures Corporation

Designation: Excavation/Area – in – Charge

Project:         University of Cebu Medical Center (UCMed)

Location:       North Reclamation Area, Subangdako, Mandaue City, Cebu, Philippines

Description:  A 12-story Hospital.

Duration: March 2013 – June 2013

 

SCOPE OF WORK  

1.     Supervise and Monitor Earthworks (Excavation, Backfilling, Stockpiling, and Hauling for Disposal) including pile heads demolition.

2.     Ensures the proper elevation and location of footing as per survey coordinates and points.

3.     Conducts survey for the location of the Disposal Area.

4.     Enforced safety at all times with respect to the site environment and condition since the area of concern was a reclamation.

5.     Prepares checklist for the Equipments before the operation.

6.     Ensures the condition of the equipment used and prepares alternate remedies and back-ups in terms of equipment failure just to guarantee the continuity of works.

7.     Supervise Concrete Pouring.

8.     Ensures that the Punchlist for all trades per floor must be addressed as Floor-in-charge.

9.     Prepares turnover document and certificates.

 

Primary Structures Corporation

Designation: Service Warranty – in – Charge

Project:         ATOMED CEBU NF2 BUILDING

Description:  State-of-the-artfacility that manufactures quality medical disposables

coupled with rigid manufacturing and quality control protocols which are accepted at hospitals and clinics worldwide.

Duration of work: January 2013  –   May 2013

       SCOPE OF WORK       

1.     Supervise masonry works which was the rectification and repair on cracks.

2.     Troubleshooting on the Supply side of the Equipments which was reported damaged.

3.     Quantify the necessary materials to be purchased.

Quantify and request the necessary materials to be purchased based on approved SPECS.
5.     Canvass possible supplier considering the time and cost without sacrificing the quality based on Specs and Standards.

Check and review materials delivery based on approved SPECS.
7.     Initiates proper preventive maintenance on the establishment to avoid malfunctioned and equipment breakdown.

8.     Attends Administrative meetings and discussions with the Owner side.

9.     Assist and facilitate the sub-contractors which do have repairs and rectification as part of service warranty.

10.  Proposes options and remedies to lessen and minimize failures and errors.

11.  Ensures the satisfaction of the costumers.

12.  Prepares turnover documents and certificates for Project Close-out.

 

Primary Structures Corporation

Designation: Cadet Engineer

Project:         All Projects of Primary Structures Corporation

Location:       Cebu, Philippines

Description: (Condominiums,Hotels,Housings&Subdivisions,Commercial, Industrial,Hospitals)

Duration:     November 2012  –  February 2013

SCOPE OF WORK     

1.     Attends on Weekly Cadetship Training Lecture and Workshop by module to all construction trades (Civil Works, Structural, Electrical, Auxiliary, Mechanical, Plumbing, Fire Protection)

2.     Participates on Weekly Assessment in Written and Actual installation of all construction works ( Rebar  Fabrication and Installation, Formworks installation, Beam and Columns installation, Masonry works/Plastering, CHB Laying, Tile Setting, Dry wall and ceiling installation, Electrical Piping and Wiring, Sanitary Pipeline installation, Welding, Painting).

3.     Conducts survey to improve productivity rates.

4.     Handles on specific scope of work in a limited period of time as part of the training exposure.

5.     Conducts site-to-site visit and stay for a period of two months per project to gather information specifically more on Methodology and Resources just to improve Productivity rates without sacrificing its quality of work.

6.     Implement proper housekeeping.

7.     Enforced safety at all times with respect to the actual site environment and condition.

 

____________________________________________________________________

TRAININGS AND SEMINARS ATTENDED

 

 

 

DATE:              ACTIVITY:                                                        FACILITATOR:

 

10/01/2011        Electrical System Design and Audit Seminar       Institute of Integrated Electrical Engineers

and Audit Seminar                                             University of Cebu Chapter

 

03/23/2012        Orientation Seminar on Electricity                       Philippine Information Agency

Conservation in Households and Schools

 

02/12/2011        Power Distribution System and Electrical            Institute of Integrated Electrical Engineers

System Design & Switchgear Medium Voltage    University of San Jose Recoletos Chapter

 

09/17/2011        AB Automation Fundamentals                            University of San Jose Recoletos

Electrical Engineering Department

 

06/09/2010        Leadership Training Seminar                              PPSK, Province of Cebu

.

 

09/20/2008        Cadetship Training Seminar for all                      Primary Structures Corporation

Construction Trades

 

 

02/10/2013        Technical Orientation Electrical System               Gigatech Inc.

La Guardia Flats 2 Project

 

02/17/2014        Product Presentation of                                     PHELPSDODGE

Aluminum Building Wire

06/05/2013        Power Tool Operators Training and                     Hilti Philippines

Preventive Maintenance

9/08/2013          Heavy Equipment training                      Primary Structures Corporation

 

10/18/2013        Management Training Program                           Primary Structures Corporation

 

10/30/2013        Construction Safety Training                              Primary Structures Corporation                                      for site safety officers
CHARACTER REFERENCES

 

 

ENGR. MILAN MONTERON

Engineering and Maintenance Head

UCMed

Ouano Avenue, Subangdako, Mandaue City, Cebu, Philippines

 

ENGR. STEVEN L. QUIZEO

Electrical Supervisor

Primary Structures Corporation

#333, V.RamaAve.,Cebu City, Cebu, Philippines

Contact No. 09177256861

  • Updated 3 years ago